About the Project: The project was funded under TEQIP III, Govt. of India. The sanctioned amount was Rs. 2,94,000.00. The main objective of this project was to develop a smart, low cost chlorophyll index meter based on Red and IR LED and Receiver and to determine the chlorophyll content index of plants. For the purpose...Read More
About the Project: The project was funded under TEQIP III, Govt. of India. The sanctioned amount was Rs. 2,74,500.00. The main objective of this project was in monitoring the quality of water and environment around deepor beel. For the purpose of monitoring the quality of water, a multi-sensor based instrumentation system has been developed. The...Read More
About the Project: The project was funded by ASTEC, Govt. of Assam. The sanctioned amount was Rs. 1,39,000.00. The system made from this project comprises of multiple sensors, which can be used to test different parameters of oil samples so that the degradation percentage of the samples can be measured. The system consists of a...Read More